Songs from 26 CDs will take a little time to collect for the purpose of being a part in this particular blog post, but it’ll happen
The 1st song we are sharing is a track from one of our CDs titled “The October 2008 Jungle Studio Session” Titled: “My Jungle Girl” AKA “My Girl” Featuring: Shane O’Brien: Guitar/Vocal Ricky Sedona: Bass Guitar Steve “Taco” Hernandez: Drums Teo Manzella: Vocals Jesse Accetta: Guitar “Hoopa Johnny” C Ricker: Guitar
The Jungle Studio and Shane O’BrienTeo Manzella performing the bass guitar and vocal on the second half of “My Girl” during a Thanksgiving recording sessionThe Men at Sound Kings Tube Amp Repairs L A CA 2010 Jess Accetta: Guitar and Ricky Sedona Bass Guitar/Guitar. Note that both musicians participated on the “My Girl” session at Shane O’Briens Jungle Studio.
Also noteworthy is that these two gentlemen created a personal handcrafted tube amplifier specifically engineered for Shane. They titled it the “Rebel 35”. This boutique amp remains as a major part of O’Briens Stage gear to date in 2019
View of one set of platforms, Permanent and temporary
View of the outside box girders before the floor beams are erected tying everything in together
View after the main floor beams are erected
Highlighting the Piers the Bridge will connect with on the approach sides
Tower Night Lights Green and Red
Notice the working platforms underneath the ne road deck. the two closest to the tower are permanent and both outside platforms are erection aids
NEW GERALD DESMOND BRIDGE UPDATE NOV 2018_JAN 2019 VIA LOCAL 433 IRONWORKER PERSPECTIVE Re: progress at both shoreline towers 16 and 17
p>The following photos of the work being performed at Tower 16 on the Terminal Island side and tower 17 on the Long Beach side of the Port of Long Beach channel.
In the first group of photos notice that the construction progress of the road deck is advancing toward the center span. The erection of road deck sections is near completion over the land segments and advancing to work that will be over the ocean’s channel heading towards the halfway point. Note that this is a balanced cantilever erection method, in other words there is an equal amount of road deck being constructed on both sides of the tower. On the back span of tower 16 heading toward the piers of the approach, construction is soon nearing the halfway point.
Tower 16 photo taken from the road deck of the old GD Bridge
Tower 17 From the Road deck of the old GD Bridge highlighting both stiff leg derricks in orange
More photos of Tower 16 Progress
This captures a time last spring when the fist pipe columns were erected facilitating the first section of road deck to be constructed
Artist rendering of the final product
Artist rendering photos obtained at the ground breaking ceremony July 2013
Night view from back channel west shore looking southAerial view of south elevationDriver’s Perspective at NightDaytime view from the back channel west shore, looking southLastly in this collection of photos, is simply a really cool shot as viewed from the tower crane operators perspective
“The Bluesman” From the Shane O’Brien and O’Briens Edge CD “The SDT Session” [c]2003
More Music to Enjoy:
Here is a rendition of a Shane O’Brien piece of music titled “The Genuine One” As much as this song is requested to be performed at live shows using a band format, this simple slow delivery hits home just as well thus it becomes slightly unique